Industrial
GAF
Full wire of a design build 16800 sq ft recycling factory. Primary service with a 1500KVA step down transformer. Wiring of all safety equipment, E-stops, process stops, temperature sensors, vibration sensors, weigh scales, and motors.
Allegheny Machine
Controls
Milward Alloys
Troubleshooting and repair of medium voltage cable from substation to factory. Medium voltage feeders from switch gear to transformer 4160 volts in delta to step down transformer.
Mayer Brothers
System Design
Lafayette Machine Shop
Service upgrade from a corner grounded 240 delta to a 480/277 Y
Vanchlor, Inc.
Conduit and wiring for sub panels
Allegheny Machine
Installation of 400 amp sub panels powered off factory bus wiring of all lights, disconnects, and motors
GAF
Pad mounted transformer
GAF
Installation of a 4000 amp 480 volt main distribution panel NEMA 3R.